Pohled - Stará Libavá, VTE Červený kopec

Wind farms

Since 2010, we have been actively involved in the development and implementation of wind power plants (WPPs). Our first major project involved the construction of a wind park in the Bruntál region with six Siemens turbines with a total capacity of 13.8 MWe. This project included the acquisition of a pre-planned project, technology optimization and complete engineering services including connection to the distribution network.

The total investment amounted to EUR 24 million.

 

Solar power plants

Between 2008 and 2010, we successfully developed and implemented solar power plants with a total installed capacity of approximately 30 MWp. These projects varied from small installations of a few hundred kWp to large-scale parks of several MWp, with the largest of these reaching 6 MWp.

Our experience and expertise enables us to provide a turnkey service - from identifying suitable sites, through design, permitting, to the actual construction and subsequent operation of the power plants. As a result, we have one of the largest portfolios of development projects in the Czech Republic.

The total investment in these projects amounted to EUR 45 million.