Skip to main content
Home

Hlavní navigace

  • Vyhledávání

    • cs
    • EN
    • de
    • es
  • Home
  • Who we are
    • About the group We are a purely Czech development group, founded in 1992.
    • Vision and goals We implement projects that have more VALUE than mere financial gain.
    • Our team The projects we prepare are the result of teamwork. Meet our team.
    • Blog News and highlights from the world of modern renewable energy
    • Download Some downloadable documents, mandatory disclosure documents.
  • What we do
    • Renewable energy sources Preparation and implementation of renewable energy projects, with an emphasis on innovation, efficiency and sustainability.
    • Innovative technologies Implementation of innovative technologies in the field of energy and environmental solutions.
    • Engineering and consulting activities Engineering and consulting services in the field of modern energy.
  • Types of realizations
    • Ready To Build Preparation of projects to a stage where construction can begin immediately.
    • Turnkey Complete project delivery from design to launch.
  • Reference projects
  • FAQ
  • Contact

Reference projects

All our projects are located in Central Europe, specifically in the Czech Republic, where there is stable support for renewable energy. The country is committed to increasing the share of renewables in the national energy mix and to meeting EU sustainability and green energy targets.

With this supportive environment, we are making a significant contribution to these goals by developing, building and operating renewable energy projects across the region.

Current projects

Transformer 400kV - SAHARA

14. 5. 2026

The First Private Sahara 400/110kV substation - Tušimice

In Tušimice, we are continuing the construction of the SAHARA project, which consists of the R-SAH 4

Ilustrační foto - BESS

14. 5. 2026

BESS - up to 1600 MWh

Planned battery energy storage system with a total output of 400 MW, operating at up to 0.25C (4h),

VTE Verušičky

21. 5. 2025

VTE Karlovy Vary ensemble

West Bohemia, May 2025 - In West Bohemia, a set of several smaller CHP parks is being prepared. The

FVE Tusimice

21. 5. 2025

Tušimice PV plant

PV plant with an installed capacity of 111 MWp with a valid building permit in RTB status. Output to

Completed projects

FVE - VS

14. 5. 2026

PV on the roofs of heat exchanger stations in Chomutov

In the summer of 2024, AHP 5HL s.r.o., a subsidiary of the ADI Group, completed a major private proj

PV Ledce Sever

22. 5. 2025

Solar Parks (2010)

We provided complete solar park design including technical solutions, grid connection, regulation, p

Větrný park Red Hill

22. 5. 2025

Red Hill Wind Park

We provided the complete design, engineering, grid connection, voltage regulation, permitting and co

ELQA s.r.o.

22. 5. 2025

Realization of LV, HV

In 2015, we acquired a 51% stake in an energy company with significant contracts in LV, HV and HV pr

AHP 3T

22. 5. 2025

Heat distribution in 3 cities

In 2016, we acquired heat distribution facilities in Moravia and transformed the company by installi

ACTHERM

22. 5. 2025

Distribution company

In 2019, we acquired a 100% stake in a company that was a regional distributor of heat to consumers

Optimus

21. 5. 2025

Project OPTIMUS

Since 2012, our research team and I have been developing the groundbreaking POL plastic recycling te

Address

Active Development Investments, a. s.
CORAL OFFICE PARK
Bucharova 2657/12
Prague 5, 158 00
Czech Republic

Contact

  • info@adinvest.cz
  • LinkedIn
  • Facebook
  • Platforma X

Navigation

  • Vyhledávání

    • cs
    • EN
    • de
    • es
  • Home
  • Who we are
  • What we do
  • Types of realizations
  • Reference projects
  • FAQ
  • Contact
©2025 Active Development Investments, a. s.
Created by drualas.cz